The gutters/spouts were cut to length right at the site, and spray painted to the color i specified. The whole job was done from 8 to 4.30 the first day and 8 to about 3 PM the next.
The gutters/spouts were cut to length right at the site, and spray painted to the color i specified. The whole job was done from 8 to 4.30 the first day and 8 to about 3 PM the next.